Snap NewsSnap News
Notification Show More
Font ResizerAa
  • World
  • India
  • Telangana
  • Andhra
  • Sports
  • Movies
  • Education
    • Admissions
    • Results
  • Latest Jobs
  • Places
  • Ask SnapNews
  • E – Paper
  • App
Search
Snap NewsSnap News
Font ResizerAa
Search
  • World
  • India
  • Telangana
  • Andhra
  • Sports
  • Movies
  • Education
    • Admissions
    • Results
  • Latest Jobs
  • Places
  • Ask SnapNews
  • E – Paper
  • App
Have an existing account? Sign In
Follow US

Home » Telangana » Hyderabad Residents Alert: Partial Water, Power Disruption on 26 November 2025

Telangana

Hyderabad Residents Alert: Partial Water, Power Disruption on 26 November 2025

Snap News Service
Last updated: November 26, 2025 4:09 am
Snap News Service
Share
2 Min Read
SHARE

Hyderabad26.11.2025: Hyderabad will witness a planned six-hour interruption in electricity supply on 26 November 2025, which will also lead to partial disruption of drinking water supply in several parts of the city. The outage is scheduled as part of maintenance work by Telangana State Transmission Corporation (TG Transco) at key 132 kV substations that power the Krishna Phase-1, Phase-2 and Phase-3 water pumping stations supplying the Hyderabad metropolitan area.

Contents
Key Points for ReadersAuthor: Snap News Service

According to the official schedule, the power shutdown will take place from 10:00 am to 4:00 pm at the Nasarlapalli water board pumping station substations. During this window, bulk feeders providing uninterrupted electricity to the Krishna water project will be switched off to facilitate maintenance and replacement of damaged current transformers, which may reduce or delay water flow to connected localities.

Singer Mangli Issue
Singer Mangli Issue: New Twist Emerges as Alleged Victims Speak Out in Fraud Case

The planned work is aimed at strengthening the reliability of power supply to the drinking water pumping network and preventing sudden breakdowns in future. However, residents living in areas dependent on Krishna Phase-1, Phase-2 and Phase-3 are advised to store sufficient drinking and household-use water in advance and use available water carefully on the day of the shutdown.

Key Points for Readers

  • Date and time: 26 November 2025, from 10:00 am to 4:00 pm
  • Reason: TG Transco maintenance and replacement of damaged equipment at 132 kV substations feeding Nasarlapalli pumping stations
  • Impact: Partial disruption of water supply in Krishna Phase-1, 2 and 3 service areas and temporary power outage during the work period
  • Advisory: Residents should plan ahead, fill overhead tanks and storage cans, and avoid wastage of water on the maintenance day
Snap News Service
Author: Snap News Service

Flipboard
Follow on Flipboard
Feedly
Follow on Feedly
Google Logo Make Us Your Trusted Source
TAGGED:HyderabadTelanagana
Share This Article
Facebook Whatsapp Whatsapp Copy Link Print
Share

You Might Also Like

Telangana to Introduce New Green Energy Policy to Achieve Renewable Goals

December 25, 2024
Lal Darwaja Bonals Ongoing in Hyderabad
Telangana

Lal Darwaja Bonals Ongoing in Hyderabad

July 28, 2024
Revanth Reddy
Telangana

CM Revanth Reddy Orders Strict Measures for Monsoon Preparedness in Twin Cities

June 17, 2024
International Women’s Day
Telangana

International Women’s Day Celebrations Held for Women Police at Godavarikhani ACP Office

March 7, 2026
Snap NewsSnap News
Follow US
All Rights Reserved 2024 © Snap News Service
  • About
  • Privacy Policy
  • Grievance
  • Fact Checking policy
  • Terms & Conditions
  • Disclimer
  • Contact Us
  • Career
  • DMCA
  • Site Map
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?